Reserves Estimation

  • A. Supervise Geotechnical & Geo-hydrological Study

    All the results of Geotechnical & Geo-hydrological drilling and laboratory testing will be used as the soil and rock parameters and also the groundwater behavior to generate the Slope Stability Analysis for Pit Design and Dump DesignSupervise Study of Mine Infrastructure.


  • B. Supervise Study of Transportation and Port

    The economics values of deposit will be depend on the transportation and port location, survey and preliminary study for evaluate the options of transportation routes and port location which suitable for short term and long term will be very important to be undertaken in this stage.


  • C. Supervise Study Mine Infrastructures

    Mine Infrastructure is essential for Processing and Preparation of mining deposit. It will be very important to evaluate the requirement of infrastructures and the capacity for cost estimation and efficiency of operational.


  • D. Evaluation of Capex (Capital Expenditure) and Opex (Operational Expenditure)

    Assist the client to evaluate and determined the capital and operating costs for budgetary planning.


  • E. Pit Optimisation

    Based on the geological & quality modeling with all modified factors, the pit limit at break even strip ratio revenue (BESR) will be determined against cost and based on the margin ranking.


  • F. Mine Design (Final Pit and Dump Design)

    Based on the Pit Limit on BESR, a Final Pit Design and Dump Design will be generated as the basis of conceptual mine planning.